Insights

PCB DFM Checklist: 10 Checks Before You Send Gerbers

PCB DFM checklist: 10 checks across bare board, assembly, and test and files

A PCB DFM checklist saves more money than almost any other hour of design work. DFM stands for design for manufacturing, and it means checking that your board can be fabricated and assembled reliably before you send the files. Most delays at the fab or the assembly house come from the same few mistakes. Here are ten checks to run before you send your Gerbers.

Checks for the bare board

  1. Match your fab’s capabilities. Minimum trace width and spacing, drill size and annular ring differ between manufacturers, and between their standard and advanced services. Read the published limits and set your design rules to them, with some margin.

  2. Check the annular rings and drills. Every pad needs enough copper around its hole, because drills are never perfectly centred. Decide early which vias are tented and which are exposed.

  3. Keep copper and components away from the board edge. Pull them back from the outline by the distance your fab recommends, so routing and V-scoring do not expose or tear anything. Assembly houses often add rails to the panel, so a compact board with parts close to the edge can still be built safely, but staying clear of the edge is the standard practice unless the design demands otherwise.

  4. Look at the solder mask. Fine-pitch pads need a sliver of mask between them to prevent solder bridges. Make sure mask openings do not expose traces you did not intend to expose.

  5. Clean up the silkscreen. Keep it off pads, make it large enough to read, and mark pin 1 and polarity on every part that has them.

Checks for assembly

6. Verify every footprint against the datasheet. Print the board at 1:1 and lay the real parts on it, especially connectors and any part you have not used before. A wrong footprint is a classic cause of respins.

  1. Mind the spacing and orientation. Leave room for the pick-and-place machine and for rework, and keep similar parts in the same orientation. Give small parts balanced pads so one end does not lift during soldering.

  2. Add fiducials and plan the panel. Assembly machines use fiducials to align the board, and many assemblers need rails or tabs. Ask them what panel layout they want before you finish the design.

Checks for test and paperwork

9. Add test points and a programming header. Put test points on the power rails and key signals, and decide now how you will program and test every board in production.

  1. Prepare the files and the BOM. Include manufacturer part numbers, approved alternates and package sizes for every part, plus the layer stack-up, the Gerbers, the drill file, the pick-and-place file and an assembly drawing. Check stock and lead times before you freeze the layout, because a part that is out of stock can delay the build more than any layout error.

Run the checks twice

Run the design rule check in your layout tool, then open the Gerbers in a separate viewer and look at the board the way the fab will see it. Many manufacturers also offer an online DFM check. Finally, ask someone who did not design the board to review it. A fresh pair of eyes finds the mistakes you have stopped seeing.

Design for manufacturing and for certification

DFM and compliance depend on the same early decisions: where the components sit, how the ground plane runs and how cables enter the board. Our guide to buck converter EMC covers the layout side, and our breakdown of what hardware certification actually costs shows what a respin does to a budget.

Get a second opinion

A review before you send files is far cheaper than a respin. If you would like an experienced engineer to check your layout and BOM, talk to us about PCB design and production. Not sure whether your board is ready? Tell us what it does and we will tell you what we would check first.

Hire us